Step 1

Pick your lot

18 lots in the first phase, from 803 to 1056 m², each with its own parcel number. 7 of them front two streets, so you can build a duplex there too. Ten more lots and a public park come with the second phase.

Lot prices vary with size and location. We quote the lot and the home together in one cost estimate.

Site plan

First phase

Click a lot to jump to its row in the table. Every lot is laid out so the house can face south, with room for a yard and a pool.

Site plan, first phaseVillapark utca runs along the edge and Levendula utca through the middle. First phase, upper row: 532/3 to 532/8, with the public park behind 7 and 8, then a cross street, then 532/9 and 532/10 side by side. Lower row, continuous: 532/20 to 532/11, with 13, 12, and 11 across from 9 and 10. Second phase: four lots behind lots 3 to 6 next to the park, with the corner lot zoned for a duplex; above them, a street branching off the cross street, and past it six lots in a row, the five on the left zoned for duplexes; another street runs above the top six lots and continues past Villa Park. House numbers on Levendula utca: even in the upper row, 2 to 16, odd in the lower row, 1 to 19, both counted from Villapark utca.Villapark utcaLevendula utcaparkduplexPhase 2 · 6 lotsduplexduplexduplexduplexduplexPhase 2 · 4 lotsLevendula utca 2., 532/3, 803 m², Available532/3803m²duplex2Levendula utca 4., 532/4, 816 m², Available532/4816m²4Levendula utca 6., 532/5, 814 m², Available532/5814m²6Levendula utca 8., 532/6, 813 m², Sold532/6813m²sold8Levendula utca 10., 532/7, 806 m², Available532/7806m²10Levendula utca 12., 532/8, 808 m², Available532/8808m²duplex12Levendula utca 14., 532/9, 1056 m², Available532/91056m²duplex14Levendula utca 16., 532/10, 1045 m², Available532/101045m²16Levendula utca 1., 532/20, 965 m², Available532/20965m²duplex1Levendula utca 3., 532/19, 858 m², Available532/19858m²duplex3Levendula utca 5., 532/18, 886 m², Available532/18886m²duplex5Levendula utca 7., 532/17, 939 m², Available532/17939m²duplex7Levendula utca 9., 532/16, 969 m², Available532/16969m²9Levendula utca 11., 532/15, 918 m², Available532/15918m²11Levendula utca 13., 532/14, 881 m², Available532/14881m²13Levendula utca 15., 532/13, 862 m², Available532/13862m²15Levendula utca 17., 532/12, 842 m², Available532/12842m²17Levendula utca 19., 532/11, 822 m², Available532/11822m²19availablesoldPhase 2, released laterduplexduplex allowedNumber on the street: house number.Schematic, not to scale.Site plan, first phaseVillapark utca runs along the edge and Levendula utca through the middle. First phase, upper row: 532/3 to 532/8, with the public park behind 7 and 8, then a cross street, then 532/9 and 532/10 side by side. Lower row, continuous: 532/20 to 532/11, with 13, 12, and 11 across from 9 and 10. Second phase: four lots behind lots 3 to 6 next to the park, with the corner lot zoned for a duplex; above them, a street branching off the cross street, and past it six lots in a row, the five on the left zoned for duplexes; another street runs above the top six lots and continues past Villa Park. House numbers on Levendula utca: even in the upper row, 2 to 16, odd in the lower row, 1 to 19, both counted from Villapark utca.Villapark utcaLevendula utcaparkduplexPhase 2 · 6 lotsduplexduplexduplexduplexduplexPhase 2 · 4 lotsLevendula utca 2., 532/3, 803 m², Available532/3803m²duplex2Levendula utca 4., 532/4, 816 m², Available532/4816m²4Levendula utca 6., 532/5, 814 m², Available532/5814m²6Levendula utca 8., 532/6, 813 m², Sold532/6813m²sold8Levendula utca 10., 532/7, 806 m², Available532/7806m²10Levendula utca 12., 532/8, 808 m², Available532/8808m²duplex12Levendula utca 14., 532/9, 1056 m², Available532/91056m²duplex14Levendula utca 16., 532/10, 1045 m², Available532/101045m²16Levendula utca 1., 532/20, 965 m², Available532/20965m²duplex1Levendula utca 3., 532/19, 858 m², Available532/19858m²duplex3Levendula utca 5., 532/18, 886 m², Available532/18886m²duplex5Levendula utca 7., 532/17, 939 m², Available532/17939m²duplex7Levendula utca 9., 532/16, 969 m², Available532/16969m²9Levendula utca 11., 532/15, 918 m², Available532/15918m²11Levendula utca 13., 532/14, 881 m², Available532/14881m²13Levendula utca 15., 532/13, 862 m², Available532/13862m²15Levendula utca 17., 532/12, 842 m², Available532/12842m²17Levendula utca 19., 532/11, 822 m², Available532/11822m²19availablesoldPhase 2, released laterduplexduplex allowedNumber on the street: house number.Schematic, not to scale.

All lots

AddressParcel no. (hrsz.)SizeDuplexStatus
Levendula utca 2.532/3duplex803 m²allowedAvailable
Levendula utca 4.532/4816 m²Available
Levendula utca 6.532/5814 m²Available
Levendula utca 8.532/6813 m²Sold
Levendula utca 10.532/7806 m²Available
Levendula utca 12.532/8duplex808 m²allowedAvailable
Levendula utca 14.532/9duplex1056 m²allowedAvailable
Levendula utca 16.532/101045 m²Available
Levendula utca 19.532/11822 m²Available
Levendula utca 17.532/12842 m²Available
Levendula utca 15.532/13862 m²Available
Levendula utca 13.532/14881 m²Available
Levendula utca 11.532/15918 m²Available
Levendula utca 9.532/16969 m²Available
Levendula utca 7.532/17duplex939 m²allowedAvailable
Levendula utca 5.532/18duplex886 m²allowedAvailable
Levendula utca 3.532/19duplex858 m²allowedAvailable
Levendula utca 1.532/20duplex965 m²allowedAvailable

Availability changes. Call before you reserve, and we’ll tell you which lots are still open.

All 18 lots are on Levendula utca; the street that leads off the village’s main street is Villapark utca. The village council set the street names and house numbers in 5/2025. (I.29.) önkormányzati határozat (municipal resolution), and they’re listed in Hungary’s national address registry.

The ten lots of the second phase and the public park will be released later; their parcel numbers and sizes will be added then.

The staked-out lots on the mowed hillside, with the houses of Csajág and the church tower behind
The lots, staked out on site. Even the lowest lot on the hill looks out over the village.

Renderings

How Villa Park could look

Renderings from 2022, showing one possible build-out of the park.

Rendering of the park
Rendering of the park
Site plan rendering: one possible build-out of Villa Park
Site plan rendering: one possible build-out of Villa Park
Levendula utca as planned, first phase
Levendula utca as planned, first phase
Levendula utca as planned, second phase
Levendula utca as planned, second phase

Building rules

Low-density, low-rise, and consistent

Villa Park’s look comes from building rules written with the village and a site plan by architect Szász Zoltán (Plan Drive Kft.). The same rules apply to every lot.

Minimum lot size
800 m²
Zoning
low-density residential (kertvárosias, HÉSZ 16/A §, the local building code)
Maximum building height
4.5 m
Street width
12 m
Front setback
5 m on one side of the street, 10 m on the other, alternating
Orientation
on every lot the house can face south
Duplexes
only on lots that front two streets

Project status

Utilities and road

A green dot means the work is done and the utility has accepted it. Power currently comes from a temporary grid that’s enough for construction; under the connection agreement with E.ON, the permanent grid will be available from August 27, 2028. The road is getting a gravel surface that can take construction traffic, and it gets paved once the homes are built.

  1. LotsDone

    All 18 lots have their own parcel numbers and are recorded in the land registry. The lot lines are staked out on site.

  2. Public waterDoneNovember 2024

    Installed and accepted by the operator, DRV Zrt., which has connected it to its network.

  3. SewerDoneNovember 2024

    Installed and accepted by the utility after inspection.

  4. Fiber internetDoneNovember 2025

    Telekom’s fiber network is installed throughout Villa Park.

  5. ElectricityTemporarypermanent grid: August 2028

    A temporary supply is in place, which is enough for construction. Under the connection agreement with E.ON, the permanent grid will be available from August 27, 2028.

  6. RoadUnderway

    The access road from Villapark utca and Levendula utca itself are under construction. A rolled gravel surface goes down first so it can take construction traffic, and the road gets paved once the homes are built.

  7. Sidewalks, stormwater drainagePlanned

    Once the road is finished.

  8. Public parkPlanned

    With the second phase.

Last updated: October 8, 2026

Visit

Come walk the lots

The lot lines are staked out. In a one-hour visit, we’ll walk the open lots with you and show you the model home.